Monday, August 15, 2011

It's all over but the waiting

Finally, my interminable summer term has come to a close. It's not that I haven't been knitting for the last month, it's just that the choice was knitting time or computer time. When you think about it, it's not really a choice. If I'm not knitting, then what do I blog about?

Anyway, all there is to do now is wait for my last teacher to stop posting on facebook for long enough to turn in our grades... but knitting blog is not for school drama, so we'll leave that there.

In the last month, I have:

-frogged the Stalagmites. I dislike them with an intensity heretofore reserved for knots in my yarn, and patterns that are incorrect. I had him try them on after finishing the heel, and not only did it not fit him, it barely fit me. I'm giving them another try because I am just that stubborn, and my OCD will not allow me to continue on to the next pattern in the book before finishing those darned socks. I'm doing them in KP palette now, though, since I don't want to waste good yarn on annoying socks.

-started and finished my second 'Camp Loopy' project, a pair of Wendy Johnson's Wrought Iron socks, in Handmaiden Swiss Mountain Sea Sock. Both the pattern and the yarn made me exceptionally happy. I suspect that the frogged cashmere from the Stalagmites will go into a pair of the Aran socks for men in the same book. I had doubts about the Wrought Iron pattern as I was making it, but followed it as written, and was not disappointed. I will forevermore trust Wendy. On the yarn, it's some of the loveliest, most luxurious yarn I've ever managed to spend quality time with. I take points away on the fact that it can be a bit splitty, and it's not as easy to pick up dropped stitches as most yarns, but I'm already using more of it, so those issues obviously didn't bother me much.


-Finished a new shawl, Dragon's Blood from Goddess Knits. The pattern was blessedly simple and got me through finals week without being forced to stab anyone with my lovely knitting needles. (That would have been a shame, I'd hate to dirty my lovely needles with blood.) I did have to go up four needle sizes to get gauge, so if you want to do the pattern, keep an eye out for that. Even going up all those needle sizes, though, I didn't use the full 880 yards of wool I had. I don't know for sure, but I would estimate having about 50 yards remaining. I would think if you went down a needle size or two, you could easily get it in under 800 yards.


-A few other projects for Hogwarts at Ravelry that I don't feel are impressive enough to post here. I confess, I actually used acrylic for some of them. *blush*

Finally up to the present, I'm starting my third and final Camp Loopy project as soon as I finish this, a Pi Shawl in yet more Handmaiden Sea Silk. Yes, even with the Camp Loopy discount Sheri was offering, I did spend WAY too much money on this yarn. It's going to be gorgeous, though. I thought the 'camping' theme of the shawl was perfect for Camp Loopy, and then more generally, I've been dying to try a Pi shawl for a while now.

Since I have the week off school, it is possible that I will inundate you with random updates on the shawl in question, since it's the only thing I plan to work on this week. I hope.

Hope everyone had a lovely summer, and that we're all knitting instead of committing assault on annoying people!

No comments:

Post a Comment